Add a comment to this line

30 Day Lane Closure On Cheras-Kajang Highway Starts Today

Jim Kem September 11, 2015 12:24

The closure of a single, left-most lane along the Cheras-Kajang highway starts today, 11th September, and will last until 11th October 2015. This affects the KL-bound direction of the highway. 

A statement made by MMC Gamuda said the closed stretch will be from kilometer 14.6 to kilometer 14.8. This is to facilitate painting and reinstatement works at P115 for the 30 day duration.

Four lanes would be reduced to three for the stretch lasting 200 metres at the existing motorist lane from the 704 Interchange (BHTO Interchange). 

About Jim Kem

"So if I push my leg down on this lever-thing, I'll somehow go faster? Woah.". I was 10 years old, and hooked. I spent a lot of my youth sketching cars and perfecting my monthly dream garage within a daydream - occasionally interjected with a chase scene, obviously. Cars move me. Things I can't get enough of: Porsches and torque.


New Car Showroom